Skip to content
Refound
Documented

Documented listings have all required provenance docs uploaded for the equipment class. Filter by which docs you need.

Require these documents

Clear (2)

Note: "Documented" is automatic from upload presence. "3rd Party Verified" is the higher trust tier.

Filters

  • Documented

    Switchgear · circuit breaker · Montréal, QC

    138 kV SF6 dead-tank breaker — 40 kA — Hydro-Québec surplus

    Refurbished outdoor SF6 breaker, 138 kV class, 40 kA short-circuit, 3-pole. Cycled out of a Hydro-Québec capacity-uprate project. Full FAT + last contact-resistance test on file.

    kV
    138
    kA
    40
    Medium
    SF6
    Year
    2015
    Cond.
    refurbished

    Asking price

  • Documented

    BESS · dc block · Hudson, CO

    Powin Pod 12-string LFP — 6.0 MWh nameplate — UL 9540 listed

    Saga HHI BESS line-up restructure surplus. 4-hour duration, LFP chemistry, EFC 412 since BOL, 96.2% SoH. UL 9540 + UL 9540A complete; KPMG capacity test attached.

    MWh
    6
    Duration
    4h
    Chemistry
    LFP
    Year
    2023
    Cond.
    cycled
    Qty
    × 4

    Asking price

  • Documented

    Switchgear · circuit breaker · Lakeway, TX

    138 kV SF6 dead-tank breaker — 40 kA — refurbished

    Refurbished outdoor SF6 breaker, 138 kV class, 40 kA short-circuit, 3-pole spring mechanism. Saga decommissioning surplus from a Wheeler Branch substation rebuild.

    kV
    138
    kA
    40
    Medium
    SF6
    Year
    2014
    Cond.
    refurbished
    Qty
    × 2

    Asking price

  • Documented

    Substation · disconnect · Pueblo, CO

    138 kV vertical-break disconnect switch — 1200 A — pair

    Pair of vertical-break disconnects from a Saga collection-substation upgrade. Like-new condition, original drawings + service report.

    Type
    disconnect
    kV
    138
    Year
    2017
    Cond.
    refurbished
    Qty
    × 2

    Asking price

  • Documented

    Solar · inverters · Phoenix, AZ

    3.5 MW central inverter — Sungrow SG3400UD-MV — 1 yr in service

    Central inverter pulled in a topology change after 14 months of operation. Full string-monitoring data on file.

    W
    3400000
    Year
    2024
    Cond.
    cycled
    Qty
    × 3

    RFQ only

    RFQ

  • Documented

    BESS · dc block · Houston, TX

    Hithium 5 MWh DC block — LFP — never commissioned

    Liquid-cooled 5 MWh DC block, originally specced for a Texas IPP project that re-scoped before commissioning. Never energized.

    MWh
    5
    Duration
    4h
    Chemistry
    LFP
    Year
    2025
    Cond.
    new
    Qty
    × 8

    Make offer

    On request

  • Documented

    Wind · turbine · Sweetwater, TX

    Vestas V90-2.0 MW turbine — full nacelle — repower removal

    Repower-source turbine: full nacelle + drivetrain + generator. ~95k operating hours; full O&M log + last gearbox borescope on file.

    MW
    2
    Hub
    80m
    Hours
    95400
    Year
    2009
    Cond.
    decommissioned

    RFQ only

    RFQ

Don't see what you need?

Save a search and we'll alert you the moment a matching unit lists. Or reach out if you have surplus inventory you want to move.