Skip to content
Refound

Marketplace / BESS / dc block

Hithium 5 MWh DC block — LFP — never commissioned

Documented new · Qty × 8 · Houston, TX · Built 2025 ·

Verified seller (anonymous)

Large BESS facility with row of containers
Large BESS facility with row of containers
Large BESS facility with row of containers
Large BESS facility with row of containers

Summary

Liquid-cooled 5 MWh DC block, originally specced for a Texas IPP project that re-scoped before commissioning. Never energized.

Quick specs

Manufacturer
Hithium
Model
HiTrene 5215
Year
2025
Quantity
8

Specifications

Cell chemistrylfp
Nameplate energy (MWh)5
Duration (h)4

The full spec table is sign-in only.

Free account + a minute. We mask the long-tail technical fields publicly so casual scrapers don't lift the data.

Sign in to see the full spec table →

Documentation

What does "Documented" mean?

All required documents for this category are on file (e.g. nameplate + DGA + Doble + Megger for transformers). Verification of the data itself is on the buyer. "3rd Party Verified" is the higher trust tier.

All required category documents have been uploaded by the seller.

Pricing

Make offer

Related listings

More bess on Refound

Documented

BESS · dc block

Powin Pod 12-string LFP — 6.0 MWh nameplate — UL 9540 listed

Saga HHI BESS line-up restructure surplus. 4-hour duration, LFP chemistry, EFC 412 since BOL, 96.2% SoH. UL 9540 + UL 9540A complete; KPMG capacity test attached.

Hudson, CO

cycled

Qty × 4

Saga Energy