Skip to content
Refound

Marketplace / BESS

BESS

Documented

Documented listings have all required provenance docs uploaded for the equipment class. Filter by which docs you need.

Require these documents

Clear (1)

Note: "Documented" is automatic from upload presence. "3rd Party Verified" is the higher trust tier.

Filters

  • Documented

    BESS · dc block · Houston, TX

    Hithium 5 MWh DC block — LFP — never commissioned

    Liquid-cooled 5 MWh DC block, originally specced for a Texas IPP project that re-scoped before commissioning. Never energized.

    MWh
    5
    Duration
    4h
    Chemistry
    LFP
    Year
    2025
    Cond.
    new
    Qty
    × 8

    Make offer

    On request